Tuesday, August 29, 2006
Construction is moving right along! Steel continues to make the building take shape. It's a slow but simple process. Most of the structure is now up, with the bar joist needing to be welded to the support beams. All total, there are 4,247 pieces of steel (including things as small as bolts and washers), weighing in at 54,261 lbs (not counting bar joists and decking).
The office/bathroom remodel is also moving right along. The bathrooms have been gutted, and several walls have the steel studs ready for the next step. The offices and new bathrooms should be reopened by the end of October!
Today's Picture Gallery (30 pictures)