Today was another slow day. Kenney's Electric started installing the new "Exit" signs inside the existing building. This is due to the fact that you can no longer exit the south entrance, so traffic must be directed towards another exit. As soon as the new exit signs are installed, a temporary wall will be built blocking the south exit (and blocking the view - rats!).
Dan Link from Landmark Architects is still determining the best path for the electrical feed from the existing building to the new building. The easiest/cheapest route would be to the boiler room, then outside along the east wall of the gym. Dan is concerned that this might cause problems when we go to build the youth/teen building. He doesn't want to be prohibited from putting footings/pilings where he needs to due to the fact that there is a buried electrical conduit there. The other route is through the gym loft. This will be much more difficult to run, as well as partially block some walkways/stairways. Hmm... A real nail biter! Which way? Which way???
Tomorrow the pier caps and grade beams should start being poured.

Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?